Service Hotline: 0757-86693218
ENGLISH
Projects > Tunnels
Tunnel field

Shanghai Fuxing East Road Tunnel Project

The Fuxing East Road Tunnel in Shanghai starts from Fuxing East Road and Guangqi Road in the west to the east of Puyang Zhangyang Road and Laoshan West Road. The total length of the project is 2785 meters. It is 1571 meters long. The upper floor of the tunnel has a clear height of 2.6 meters and is a two-lane lane for small vehicles. The lower floor has a clear height of 4 meters. It is a single lane for large vehicles and an emergency parking lane.


Fuxing East Road Tunnel is the world's first double-layer, double-pipe, 6-lane underground river-crossing tunnel in operation, which improves traffic capacity by 40% over similar single-layer tunnels. It is the fifth cross-river tunnel constructed in Shanghai after Dapu Road Tunnel, Yan'an East Road Tunnel, Outer Ring Tunnel and Dalian Road Tunnel. Its operation has largely eased the traffic pressure on Nanpu Bridge and Yan'an East Road Tunnel.


The opening of the Fuxing East Road Tunnel has directly facilitated the connection between Puxi's Huangpu District and Pudong District. It will be very convenient for Pudong citizens to visit Puxi's Huangpu District, Xintiandi in Luwan District, and the future Expo area.

Among them, the NXT direct-fired high-temperature fire exhaust axial flow fan innovation project passed the acceptance of the Technology Innovation Foundation of the Ministry of Science and Technology, and the product was identified as a national key new product.

   

        

Site Map | E-mail | Download | Site